  Item #   7. B. 1.    
City Council
Meeting Date: 05/13/2019  
Submitted For: Keith Beatty Submitted By: Keith Beatty, Engineering

Information
Item

Consideration and Approval of Engineering Services Contract with Cabbiness Engineering, LLC for maintenance and improvements for the Spring Creek Tributary 1, south of 2nd Street running through the Willowood Addition; $39,000.

Background
This design contract will develop construction plans to address ongoing channel erosion between 2nd Street and the Willowood Lonsdale drainage structure and add additional scour protection immediately upstream of the concrete channel liner.  Also included is sediment removal at the downstream end of the concrete channel liner along with some grouted riprap repair for a storm sewer pipe that stubs into the channel.  The contract will include HEC-RAS modeling of the improvements and as-built after the construction to ensure there is no rise in the 100-year water surface elevation.

The Stormwater Drainage Advisory Board recommended approval of the design contract at the March  26, 2019 meeting.
Time Frame
Immediate upon approval.
Issue

Ongoing Scour of the Channel.

Recommendations
The Stormwater Drainage Advisory Board and staff recommend approval.
Action Needed
Motion to approve.
Public Notification
Posted City Council Agenda.

Fiscal Impact
Funding/Cost: $39,000
Budgeted Item Y/N or N/A: Y
Account:
568038-8401 - Drainage Utility Capitalized Consulting Costs
Attachments
Location Map
Aerial Map
Photos
Design Contract